Jump to content
Stefan Schneider

Released: Extended Rights Management (Hot Topic)

Recommended Posts

One hurdle in working with colleagues in different roles in Meisterplan is that the permission levels are too global for certain use cases. 
We will soon be offering a bundle of new rights. Here is a preview of the extended view when editing user rights:

image.png.f89365547bd0082570d7464a43dee7d2.png

  • Thumb Up 1

Share this post


Link to post
Share on other sites

It looks very nice to me. Do you have planed to go on with more possibilitys?

We would be very greatful, when a Project Manager can see all Projects, but only edit (Ressource and TimeI) his own Projects.

 

Thomas

Share this post


Link to post
Share on other sites

Thank you for the great feedback. This is not in scope for the first release but we are already collecting feedback for future updates. We don't yet know when another update might be available but we will take this into consideration when we start working on it.

Share this post


Link to post
Share on other sites

Thomas, while Meisterplan is being prepared for a future update on this, have you tried creating a portfolio for each of your Project Managers? This will display only their work in the top 'Projects' section. Then your PM's can go to Settings and check the 'Show Top Level All' box in the Resources and Roles section. This will then show all of the projects in the system that have a role or resource allocated to them, but the PM can only change their own projects.

image.png.bbf9cba1ed0ad59c4861b999407ba145.png

Does that help?

Share this post


Link to post
Share on other sites

We have released it!

You will find all details in the update information https://help.meisterplan.com/hc/en-us/articles/360015173911-Update-10-04-2018

See also the new overview how to set user rights by PPM role (https://help.meisterplan.com/hc/en-us/articles/360015551952/)  which gives a good orientation about the existing options.

  • Thumb Up 1

Share this post


Link to post
Share on other sites

Hello,

Is there a plan to have a table. If I need to modify many users then it would be great if the administrator could work in a table instead of in each single tab.

Thanks

 

Clipboard01.jpg

Share this post


Link to post
Share on other sites

Thanks for your feedback. 

We already got some feedback on doing configuration faster for many users. We don't have that on our short term roadmap. As soon as we will work on the concept, we also will consider your point.

Share this post


Link to post
Share on other sites

@Stefan Schneider Hi Stefan. Just tested the rights management and found a small issue. 

I can still change Milestones even though all Project rights are disabled. I find it a bit confusing that you can still update a Project Milestone, when you don't have access to create edit, or update the project itself.

M  

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...